Gateway of Pacific Phase 2

As the next chapter in the development of South San Francisco’s premier biotechnology campus, Gateway of Pacific Phase 2 sets a striking architectural tone along Gateway Boulevard. Located directly south of Phase 1, this phase introduces a 9-level, core-and-shell life science research facility designed to foster innovation, collaboration, and flexibility for future tenant needs.

Project Details

Project Owner:

BioMed Realty

Contractor:

Hathaway Dinwiddie

Structural Engineer:

MKA

Architect:

Flad Architects

Steel Tonnage:

tons

Location:

San Francisco, CA

Schuff Services: Project Management, Steel Detailing, Steel Fabrication, Steel Erection

Project Overview

This phase establishes a sculptural, high-performance tower that integrates seamlessly into the campus’s people-centric master plan. The building’s design allows for open, adaptable lab and office space, tailored to evolving scientific research and workplace requirements. Enhanced landscaping along the perimeter ties into a central park and adjacent amenities, reinforcing wellness and connectivity.

Project Features:

  • 9-level laboratory/office tower with 1 basement level, designed to look like two buildings
  • LEED® Gold certification for sustainable design and occupant wellness
  • Located adjacent to an 8-level parking structure with 2 levels below grade
  • Expansive outdoor plaza and site infrastructure connecting to Phase 1

Schuff Steel Contributions:

  • Project Management: Oversaw complex logistics and scheduling across multiple construction teams to ensure smooth coordination on a high-profile, multi-phase job site.
  • Steel Detailing: Delivered precise, constructible 3D models to streamline fabrication and resolve design complexities in advance.
  • Steel Fabrication: Produced high-performance structural steel tailored to the demanding tolerances and scale of a biotech research facility.
  • Steel Erection: Safely and efficiently erected structural steel on a tight site surrounded by active construction zones and ongoing campus operations.

Schuff Steel is proud to contribute to this landmark campus, delivering expert structural support to a project redefining the life sciences landscape in the Bay Area.

Let’s talk about
your next project

    Gateway of Pacific Phase 2

    Project Details

    Project Owner:

    BioMed Realty

    Contractor:

    Hathaway Dinwiddie

    Structural Engineer:

    MKA

    Architect:

    Flad Architects

    Steel Tonnage:

    tons

    Location:

    San Francisco, CA

    Schuff Services: Project Management, Steel Detailing, Steel Fabrication, Steel Erection

    As the next chapter in the development of South San Francisco’s premier biotechnology campus, Gateway of Pacific Phase 2 sets a striking architectural tone along Gateway Boulevard. Located directly south of Phase 1, this phase introduces a 9-level, core-and-shell life science research facility designed to foster innovation, collaboration, and flexibility for future tenant needs.

    This phase establishes a sculptural, high-performance tower that integrates seamlessly into the campus’s people-centric master plan. The building’s design allows for open, adaptable lab and office space, tailored to evolving scientific research and workplace requirements. Enhanced landscaping along the perimeter ties into a central park and adjacent amenities, reinforcing wellness and connectivity.

    Project Features:

    • 9-level laboratory/office tower with 1 basement level, designed to look like two buildings
    • LEED® Gold certification for sustainable design and occupant wellness
    • Located adjacent to an 8-level parking structure with 2 levels below grade
    • Expansive outdoor plaza and site infrastructure connecting to Phase 1

    Schuff Steel Contributions:

    • Project Management: Oversaw complex logistics and scheduling across multiple construction teams to ensure smooth coordination on a high-profile, multi-phase job site.
    • Steel Detailing: Delivered precise, constructible 3D models to streamline fabrication and resolve design complexities in advance.
    • Steel Fabrication: Produced high-performance structural steel tailored to the demanding tolerances and scale of a biotech research facility.
    • Steel Erection: Safely and efficiently erected structural steel on a tight site surrounded by active construction zones and ongoing campus operations.

    Schuff Steel is proud to contribute to this landmark campus, delivering expert structural support to a project redefining the life sciences landscape in the Bay Area.

    Let’s talk about
    your next project