415 Natoma

Anchoring Brookfield’s four-acre 5M Development in San Francisco’s SoMa District, 415 Natoma is a 25-story, 640,000 sq. ft. Class-A office tower designed to foster innovation and community.

Project Details

Contractor:

Swinerton Builders

Structural Engineer:

Magnusson Klemencic Associates

Architect:

House & Robertson

Steel Tonnage:

7,000 tons

Location:

San Francisco, CA

Schuff Services: Project Management, Steel Detailing, Steel Fabrication, Steel Erection, BRB

Project Overview

The tower was built on a tight site adjacent to a historic 110-year-old structure and within a complex urban environment that required precise coordination with concurrent construction and renovation activities on the remaining 5M parcels.

Notable features include:

  • 27,000+ square feet of outdoor terraces and half an acre of open green space
  • State-of-the art office space and two levels of underground parking
  • Innovative buckling-restrained brace (BRB) system replacing a traditional concrete core, opening the south façade to daylight
  • Advanced HVAC and greywater systems
  • Publicly accessible indoor-outdoor gathering spaces with adjacent retail and dining
  • Dynamic exterior features with multiple terraces, three curtainwall types and two primary storefront materials

A focus on sustainable design and wellness helped the project achieve triple certification: LEED Gold, WELL Health and Safety, and Fitwell Community. 415 Natoma was also awarded ENR Best Project Winner for 2022.

Schuff Steel Contributions:

  • Steel Fabrication & Erection: Schuff Steel fabricated and erected 7,000 tons of steel for 415 Natoma, delivering structural solutions on a densely packed urban site with limited laydown area.
  • Innovative BRB Integration: Our team supported the installation of the BRB system which allowed for exterior elevator core placement and unobstructed southern exposure.
  • Efficient Construction Sequencing: In close collaboration with the project team, Schuff Steel navigated significant supply chain challenges and contributed to the project’s on-time and on-budget completion.

415 Natoma stands as a hallmark of urban architectural innovation and sustainability, not only elevating the San Francisco skyline but also redefining the modern workplace.

Let’s talk about
your next project

    415 Natoma

    Project Details

    Contractor:

    Swinerton Builders

    Structural Engineer:

    Magnusson Klemencic Associates

    Architect:

    House & Robertson

    Steel Tonnage:

    7,000 tons

    Location:

    San Francisco, CA

    Schuff Services: Project Management, Steel Detailing, Steel Fabrication, Steel Erection, BRB

    Anchoring Brookfield’s four-acre 5M Development in San Francisco’s SoMa District, 415 Natoma is a 25-story, 640,000 sq. ft. Class-A office tower designed to foster innovation and community. The tower was built on a tight site adjacent to a historic 110-year-old structure and within a complex urban environment that required precise coordination with concurrent construction and renovation activities on the remaining 5M parcels.

    Notable features include:

    • 27,000+ square feet of outdoor terraces and half an acre of open green space
    • State-of-the art office space and two levels of underground parking
    • Innovative buckling-restrained brace (BRB) system replacing a traditional concrete core, opening the south façade to daylight
    • Advanced HVAC and greywater systems
    • Publicly accessible indoor-outdoor gathering spaces with adjacent retail and dining
    • Dynamic exterior features with multiple terraces, three curtainwall types and two primary storefront materials

    A focus on sustainable design and wellness helped the project achieve triple certification: LEED Gold, WELL Health and Safety, and Fitwell Community. 415 Natoma was also awarded ENR Best Project Winner for 2022.

    Schuff Steel Contributions:

    • Steel Fabrication & Erection: Schuff Steel fabricated and erected 7,000 tons of steel for 415 Natoma, delivering structural solutions on a densely packed urban site with limited laydown area.
    • Innovative BRB Integration: Our team supported the installation of the BRB system which allowed for exterior elevator core placement and unobstructed southern exposure.
    • Efficient Construction Sequencing: In close collaboration with the project team, Schuff Steel navigated significant supply chain challenges and contributed to the project’s on-time and on-budget completion.

    415 Natoma stands as a hallmark of urban architectural innovation and sustainability, not only elevating the San Francisco skyline but also redefining the modern workplace.